Case studies
Bulk Handling & Rail Logistics case studies
Level, temperature and equipment monitoring across sites where the product spends most of its life in transit or in a tank.
4 of our 19 case studies are in this sector.
A real page with its own address (§B.2), reachable from the Industries hub, the sector page and the library’s industry rail.
What we found in factories like these.
Compressed airWaterFood & Beverage ProcessingBulk Handling & Rail Logistics
Over 450,000 litres saved in four months, and the clearest compressor graph we've produced
PDI Bulk
>450,000 litres of water saved in four months, and the clearest before/after compressor graph we've ever produced.
>450,000 Lin 4 months
Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: automotive, plastics & rubber
Conveyor drive bearing degradation caught six weeks early
A bulk handling facility
A bearing changed its signature about six weeks before it would have seized.
6 weeksof warning
Energy & electricityBulk Handling & Rail Logistics
Night setback that never happened
A distribution warehouse
The overnight setback had silently stopped working, and it was worth about a third of the load.
~35%of overnight electrical load
Silo & levelPharmaceutical & ChemicalMunicipal & Public UtilitiesBulk Handling & Rail Logistics
Tank level and inventory reconciliation
A bulk chemical storage operation
Measured tank level reconciled against what the paperwork said was in there.
Continuousreconciliation
See what these numbers look like in your factory.
Bring us a shift and a stack of bills. We will walk the floor with your team, point at what is worth metering first, and put a figure beside it.
Book a site visitRun the numbers
or call 1-833-QUANTFY (1-833-782-6839)
